GSO 906:1997

IEC 60358:1990
Gulf Standard · Edition 1   Current Edition · Approved on 15 October 1997

Coupling capacitors and capacitor dividers

GSO 906:1997 Files

Arabic 48 Pages
Current Edition
USD 64.0
English 31 Pages
Current Edition Reference Language
USD 52.0

GSO 906:1997 Scope

This standard is applicable to: a) coupling capacitors for power line carrier (PLC) systems on high voltage overhead power lines the power-frequency range being 15 Hz to 60 Hz and the carrier frequency range 30 kHz to 500 kHz; b) capacitor dividers or capacitor voltage transformers. Additional requirements for capacitor voltage transformers are given in the standard approved by GSO concerned with “Voltage transformers" (1); c) capacitors with one terminal either permanently earthed or at low voltage as used for overvoltage protection and other similar uses.

Best Sellers From Electrical Sector

YSMO GSO 2530:2023
GSO 2530:2016 
Yemeni Technical Regulation
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 35:2007
 
Gulf Standard
Methods of test for lead-acid starter batteries used for motor vehicles and internal combustion engines

Recently Published from Electrical Sector

GSO IEC 60691:2025
IEC 60691:2023 
Gulf Standard
Thermal-links - Requirements and application guide
GSO IEC 60335-2-65:2025
IEC 60335-2-65:2023 
Gulf Standard
Household and similar electrical appliances - Safety - Part 2-65: Particular requirements for air-cleaning appliances
GSO IEC 62841-2-18:2025
IEC 62841-2-18:2024 
Gulf Standard
Electric motor-operated hand-held tools, transportable tools and lawn and garden machinery - Safety - Part 2-18: Particular requirements for hand-held strapping tools
GSO IEC 63241-1:2025
IEC 63241-1:2023 
Gulf Standard
Electric motor-operated tools - Dust measurement procedure - Part 1: General requirements