Application integration at electric utilities - System interfaces for distribution management - Part 13: Common distribution power system model profiles
GSO IEC 61968-13:2024 Files
No files are available for this standard right now!
GSO IEC 61968-13:2024 Scope
IEC 61968-13:2021 specifies profiles that can be used to exchange Network Models in a Utility or between a Utility and external applications to the utility. This document provides a list of profiles which allow to model balanced and unbalanced distribution networks in order to conduct network analysis (Power flow calculation). Therefore it leverages already existing profiles (IEC 61970-45x based on IEC 61970-301 (CIM base) or profiles based on IEC 6196811 CIM extension for Distribution). This document reuses some profiles without any change, or eventually extends them or restricts them. Moreover it proposes other profiles to reflect Distribution needs.
Use of CIM in Distribution is not a new topic. This document includes informative parts, as CIM model extensions, which could be integrated in future versions of the IEC CIM Model. These extensions have been used by some utilities for utility internal information exchange use cases and to support information exchanges between different market participants like Transmisstion System Operators (TSO), Distributed System Operators (DSO), Distributed Network Operators (DNO) and Significant Grid Users (SGU) including generators and industry.
This second edition cancels and replaces the first edition published in 2008. This edition constitutes a technical revision. This edition was pre-tested during 2016 ENTSO-E interoperability tests. The interoperability test report mentions: "Some vendors demonstrated that the transformation between distribution network and CGMES is possible. This is a first step towards the efforts to have closer integration between CGMES and profiles for exchanging distribution data (CDPSM)."
Use of CIM in Distribution is not a new topic. This document includes informative parts, as CIM model extensions, which could be integrated in future versions of the IEC CIM Model. These extensions have been used by some utilities for utility internal information exchange use cases and to support information exchanges between different market participants like Transmisstion System Operators (TSO), Distributed System Operators (DSO), Distributed Network Operators (DNO) and Significant Grid Users (SGU) including generators and industry.
This second edition cancels and replaces the first edition published in 2008. This edition constitutes a technical revision. This edition was pre-tested during 2016 ENTSO-E interoperability tests. The interoperability test report mentions: "Some vendors demonstrated that the transformation between distribution network and CGMES is possible. This is a first step towards the efforts to have closer integration between CGMES and profiles for exchanging distribution data (CDPSM)."
Best Sellers From Electrical Sector
YSMO GSO 2530:2023
GSO 2530:2016
Yemeni Technical Regulation
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO 2770:2024
Gulf Standard
WATER HEATERS - ENERGY PERFORMANCE REQUIREMENTS
GSO IEC 61508-7:2024
IEC 61508-7:2010
Gulf Standard
Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 7: Overview of techniques and measures (see Functional Safety and IEC 61508)
GSO IEC 62148-17:2024
IEC 62148-17:2023
Gulf Standard
Fibre optic active components and devices - Package and interface standards - Part 17: Transmitter and receiver components with dual coaxial RF connectors
GSO IEC 63027:2024
IEC 63027:2023
Gulf Standard
Photovoltaic power systems - DC arc detection and interruption