GSO IEC 62820-2:2022
IEC 62820-2:2017
Gulf Standard
Current Edition
·
Approved on
12 May 2022
Building intercom systems - Part 2: Requirements for advanced security building intercom systems (ASBIS)
GSO IEC 62820-2:2022 Files
No files are available for this standard right now!
GSO IEC 62820-2:2022 Scope
IEC 62820-2:2017 specifies the technical requirements for the composition, function, performance and testing methods of Advanced Security Building Intercom Systems. This document is applicable for intercom systems used for any advanced security communication in buildings. Advanced security building intercom systems (ASBIS) are used for rapid emergency and danger messages verification by voice communication, warning of a danger, rapid notification of the responsible emergency services/intervention services and for sending instructions on how to proceed. The requirement for a suitable concept is prior risk assessment and a definition of the protection target.
Best Sellers From Electrical Sector
YSMO GSO 2530:2023
GSO 2530:2016
Yemeni Technical Regulation
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO 2770:2024
Gulf Standard
WATER HEATERS - ENERGY PERFORMANCE REQUIREMENTS
GSO IEC 63027:2024
IEC 63027:2023
Gulf Standard
Photovoltaic power systems - DC arc detection and interruption
GSO IEC 60885-3:2024
IEC 60885-3:2015
Gulf Standard
Electrical test methods for electric cables - Part 3: Test methods for partial discharge measurements on lengths of extruded power cables
GSO IEC TS 62257-9-2:2024
IEC TS 62257-9-2:2016
Gulf Standard
Recommendations for renewable energy and hybrid systems for rural electrification - Part 9-2: Integrated systems - Microgrids