GSO ISO 2975-1:2014

ISO 2975-1:1974
Gulf Standard   Current Edition · Approved on 25 December 2014

Measurement of water flow in closed conduits -- Tracer methods -- Part 1: General

GSO ISO 2975-1:2014 Files

English 11 Pages
Current Edition Reference Language
USD 80.32

GSO ISO 2975-1:2014 Scope

This International Standard deals with the measurement of water flow in closed conduits by using tracer methods; the flow of other liquids and of gases will be dealt with in subsequent International Standards. These methods apply to flow measurement in conduits into which a solution can be injected and those cases where effective mixing of this solution with the water flowing in the conduit can be achieved, this last condition being fundamental. Three fundamental procedures are used : Two procedures, known as the constant rate injection method and the integration (sudden injection) method, are based on the dilution principle : a tracer solution is injected into the conduit and the dilution (ratio) of this tracer in the water flowing in the conduit is determined, this dilution being proportional to the rate of flow, The third is a method of measurement of the mean transit time (formerly called Allen velocity method) : the tracer is injected into the conduit and the time taken by the tracer to travel a specified length between two cross-sections in each of which it is detected, is measured. In these three methods, the advantages and disadvantages of which are considered in clause 4, the distance between injection and measuring sections should be great enough to achieve adequate mixing of the tracer with the water flowing in the conduit; the problem of an adequate mixing distance is considered in clause 6. A large number of different tracers may be used, such as radioactive or non-radioactive, mineral or organic materials. The choice of tracer depends on the circumstances of the measurement (clause 5). The error in measurements using tracers can be less than 1 % under good conditions (clause 7).

Best Sellers From Metrology Sector

GSO OIML R87:2021
OIML R87:2016 
Gulf Standard
Quantity of product in prepackages
GSO OIML R79:2021
OIML R79:2015 
Gulf Standard
Labeling requirements for prepackages
GSO OIML R 76-1:2009
OIML R 76-1:2006 
Gulf Standard
Non-automatic weighing instruments – Part 1: Metrological and technical requirements - Tests
GSO OIML R111-1:2007
OIML R111-1:2004 
Gulf Standard
Weights of classes E1, E2,F1,F2,M1,M1-2,M2,M2-3 and M3 Part 1: Metrological and Technical requirements

Recently Published from Metrology Sector

GSO ISO 5059-1:2026
ISO 5059-1:2025 
Gulf Standard
Geometrical product specifications (GPS) — Dimensional measuring equipment — Part 1: Design and metrological characteristics of two-point inside micrometers
GSO ISO 25178-602:2026
ISO 25178-602:2025 
Gulf Standard
Geometrical product specifications (GPS) — Surface texture: Areal — Part 602: Design and characteristics of non-contact (confocal chromatic probe) instruments
GSO ISO 6425:2026
ISO 6425:2018 
Gulf Standard
Horology — Divers' watches
GSO IEC 61452:2026
IEC 61452:2021 
Gulf Standard
Nuclear instrumentation - Measurement of activity or emission rate of gamma-ray emitting radionuclides - Calibration and use of germanium-based spectrometers