GSO IEC TR 60268-18:2014
IEC TR 60268-18:1995
Gulf Standard
Current Edition
·
Approved on
25 December 2014
Sound system equipment - Part 18: Peak programme level meters - Digital audio peak level meter
GSO IEC TR 60268-18:2014 Files
English
23 Pages
Current Edition
Reference Language
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
GSO IEC TR 60268-18:2014 Scope
This technical report describes a digital audio peak level indicator for professional and consumer use to indicate the peak levels of sampled and quantized audio signals. The purpose of this technical report is to establish a basic plan for standards development concerning the characteristics to be specified and the relevant methods of measurement for a digital audio peak level meter.
Best Sellers From Electrical Sector
YSMO GSO 2530:2023
GSO 2530:2016
Yemeni Technical Regulation
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO IEC 62973-3:2025
IEC 62973-3:2024
Gulf Standard
Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 3: Lead acid batteries
GSO IEC 60352-2:2025
IEC 60352-2:2024
Gulf Standard
Solderless connections - Part 2: Crimped connections - General requirements, test methods and practical guidance
GSO IEC 62841-4-1:2025
IEC 62841-4-1:2017
Gulf Standard
Electric motor-operated hand-held tools, transportable tools and lawn and garden machinery - Safety - Part 4-1: Particular requirements for chain saws
GSO IEC 62933-5-3:2025
IEC 62933-5-3:2023
Gulf Standard
Electrical energy storage (EES) systems - Part 5-3: Safety requirements for grid-integrated EES systems – Performing unplanned modification of electrochemical based system