GSO IEC 62386-351:2026

IEC 62386-351:2025
Gulf Standard   Current Edition · Approved on 17 September 2026

Digital addressable lighting interface – Part 351: Particular requirements – Control devices – Luminaire-mounted control devices

GSO IEC 62386-351:2026 Files

English 15 Pages
Current Edition Reference Language

GSO IEC 62386-351:2026 Scope

IEC 62386-351:2025 is applicable to control devices to be used in, on, or attached to, a luminaire. This document builds on the digital addressable lighting interface as specified in the IEC 62386 series of standards, by adding specific requirements for power consumption, integrated bus and AUX power supplies, a mechanism to arbitrate between multiple application controllers, and a memory bank definition for multi-master devices.
This document is only applicable to control devices complying with IEC 62386‑103.

Best Sellers From Electrical Sector

YSMO GSO 2530:2023
GSO 2530:2016 
Yemeni Technical Regulation
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 35:2007
 
Gulf Standard
Methods of test for lead-acid starter batteries used for motor vehicles and internal combustion engines

Recently Published from Electrical Sector

GSO IEC 63522-32:2026
IEC 63522-32:2025 
Gulf Standard
Electrical relays - Tests and measurements - Part 32: Acoustic noise
GSO IEC 60227-5:2026
IEC 60227-5:2024 
Gulf Standard
Polyvinyl chloride insulated cables of rated voltages up to and including 450/750 V - Part 5: Flexible cables (cords)
GSO IEC TS 62600-301:2026
IEC TS 62600-301:2019 
Gulf Standard
Marine energy - Wave, tidal and other water current converters - Part 301: River energy resource assessment
GSO IEC TS 62600-10:2026
IEC TS 62600-10:2021 
Gulf Standard
Marine energy - Wave, tidal and other water current converters - Part 10: Assessment of mooring system for marine energy converters (MECs)