ISO/TR 7035-2:2024

International Standard   Current Edition · Approved on 30 September 2024

Design and asset management of DIP for water application — Part 2: Design, installation and operation

ISO/TR 7035-2:2024 Files

English 23 Pages
Current Edition
165.98 USD

ISO/TR 7035-2:2024 Scope

The objective of this document is to assist conceptors, engineering offices, water companies or project owners in the design, installation and operation of the ductile iron pipeline systems for water supply:

     introduce practices for design, installation and operation of new ductile iron pipe water supply systems, rehabilitation or renovation;

     refers to existing standards that specify products’ design, installation and site testing, materials and coatings.

This document gives efficient support to ISO/TR 7035-1 which indicates chapters here for readers’ reference.

Best Sellers

GSO 150-2:2013
 
Gulf Standard
Expiration dates for food products - Part 2 : Voluntary expiration dates
YSMO GSO 150-2:2020
GSO 150-2:2013 
Yemeni Technical Regulation
Expiration dates for food products - Part 2 : Voluntary expiration dates
YSMO GSO 2055-1:2020
GSO 2055-1:2015 
Yemeni Standard
HALAL FOOD - Part 1 : General Requirements
GSO 2055-1:2015
 
Gulf Technical Regulation
HALAL FOOD - Part 1 : General Requirements

Recently Published

ISO 24690:2025
 
International Standard
Glass reinforced thermosetting plastic (GRP) pipes — Test method for the determination of long-term pressure endurance strength
ISO 15614-11:2025
 
International Standard
Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 11: Electron and laser beam welding
IEC/TS 81001-2-2:2025
 
International Standard
Health software and health IT systems safety, effectiveness and security — Part 2-2: Guidance for the implementation, disclosure and communication of security needs, risks and controls
ISO 37190:2025
 
International Standard
Guidance for practical implementation of ISO 37155 series for supervising at each life cycle phase of smart community infrastructures